(801) 859-6508
 

Layton, UT

Land-Clearing 

This  project involved the clearing of 29 Acres of land in preparation for a large housing development. Over the course of four days we cleared a large quantity of trees and large stumps. The trees were later shredded to be recycled and then removed from the site.

1/5

1/5

Structure Demolition

We demolished a two-story home, including a two-car detached garage, and driveway. We also grubbed and cleared the lot to prepare for the construction of a new home and excavated the basement.

1/2

Complete INterior Demolition

We repurposed a commercial building by gutting the interior structures (including bathrooms, office spaces, break room, carpet, etc.) We hauled off the debris, swept, and pressure washed the concrete inside, leaving a clean surface for a new purpose. 

Structure Removal

1/3

We demolished a home in its entirety to prepare for the construction of a new home. We also removed large trees and stumps, leaving a clean building site for a new structure.

1/7

Structure Demolition

We demolished two homes in their entirety to prepare for the construction of a new home. We also removed large trees and stumps, leaving a clean building site for a new structure.

1/6

Structure Demolition

We demolished two homes in their entirety to prepare for the construction of a new home. We also removed large trees and stumps, leaving a clean building site for a new structure.

1/9

Disaster Demolition

This project included the demolition of a car dealership that was damaged in a fire. We removed trees, stumps, light poles, etc., leaving a clean building site. 

Road Widening Preparation

1/4

This project included the preparation for the expansion of a road. We removed large trees and stumps to leave a prepared space for further expansion.

1/7

Disaster Demolition

This project included the demolition of a home that was involved in a destructive house fire.